ROC’s Offshore Wind Turbine Installation Solution Appeared at Distributed Generation China 2013
From June 19th to 20th,
deputy general manager Mr. Liu Yongjiang from Nantong Rainbow Offshore
& Engineering Equipments Co., Ltd. (“ROC” for short) as a guest
speaker representative attended Distributed Generation China 2013 in
Shanghai. About 1,000 people attended the conference, including seniors
from well-known offshore wind turbine manufacturers and operating
companies around China, Holland, Denmark, and Germany, etc.
ROC
independently designed and built the first local offshore wind turbine
installation platform (“Platform” for short) and focused on the overall
solution for offshore wind turbine installation and maintenance. On the
basis of the comprehensive research and analysis on local offshore wind
farm, ROC put forward the integrated wind turbine installation solution
suitable for local coastal. ROC analyzed market and introduced R&D
of technology, innovation, scientific cooperation on offshore wind
turbine installation, as well as successful operation and maintenance
case of the Platform. ROC made full demonstration of the new technology
and products to the domestic and foreign customers.
In
the offshore wind turbine installation area, China still lack in
professional offshore wind turbine installation equipment and solution
under the large planning market. Few local companies can compete with
international enterprises. The technology of ROC’s offshore wind turbine
installation aroused great interest among customers and had positive
effect on the enterprise image and business development.


- Previous article:ROC’s First OWU Appeared at Offshore Wind China 2013
- Next article:ROC Signed Shipbuilding Contract for 60.5m AHTS